A proposed data center in northwestern Alberta could generate dozens of atomic bombs worth of heat every day.
cross-posted from: https://lemmy.zip/post/74351191
A proposed data center in northwestern Alberta could generate dozens of atomic bombs worth of heat every day.
On the order of 20MW continuous draw, saved you the math.
That’s pretty small for an industrial load and some hyperscale data-centers are in the 500MW scale.
500mw???
Metric motherfucker, do you speak it?
Watts are metric.
So is m - milli and M - mega. Which the poster above does not seem to understand.
No, I understand. Let me capitalize it for you so you understand: 500MW???
https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta
A bunch of the under-construction sites are set to be GW consumers as well.
Don’t you mean milliwatt???