    Yes, that’s why instead of expropriating people, we could be expropriating companies owning the rails, and double or triple the amount of tracks in that existing corridor. That’s where demand currently is.

    The line between Montreal and Québec City on the south shore is only double tracked until St-Hyacinthe. Past that, it’s single track until Ste-Foy and trains have to wait to pass each other. Sometimes I’m five minutes away from Drummondville, the train is in the city. Then we have to wait 10 minutes delayed on a side track, a few hundred meters from the station, because there’s only a single track passing on front of the damn station. There were two in the past. There’s space, the second track is still there. But it’s disconnected, has no switch, and the CN doesn’t give a fuck.

    It could easily be upgraded and worked around to help the movement of existing trains, but no. No upgrades, no changes. Just wait for the new shiny project that will not bring me where I want to go. Also, there are two single tracks routes between Montreal and Sherbrooke, and none of them is used to squeeze in passenger trains between freight trains. They’re not even trying, as it would cost “too much money to run”, and private construction companies would make much less profit.

    I’m even eagerly awaiting the closure of a now abandoned line between St-Hyacinthe and Farnham, because the only good thing we will probably get out of this is a bike path in two decades.

    Although for once, instead of expropriating farmers for highways, we’re doing it for trains, and it’s quite funny (or depressing) to see how socially acceptable it is for cars and highways, but not for trains.

    EDIT: Just looking at it makes me angry

      • pedz@lemmy.ca
        link
        fedilink
        arrow-up
        1
        ·
        2 hours ago

        Doesn’t need to be high speed. Just more frequent than 5 delayed trains a day that can’t pass in stations because the CN wants to save some money on having only one rail crossing a road instead of two.

        As mentioned in other comments, good for Alto and high speed. But as one of the idiots currently using trains and public transit in a region where it’s deficient, I don’t really want high speed. I just want actual trains not to be delayed by 10-15 minutes a few hundred meters away from a station because they have to wait for a freight train to pass, while there’s already space and tracks, but they’re just not arranged efficiently, because the private company owning the rail doesn’t see any profit in that.

        The actual system can be improved with a little bit of will from the government, but all eyes are on a shiny new project that will evict people from their land, instead of just making sure current trains can pass each other at Drummondville station. We can’t come to an agreement with the CN? Again, good for Alto, but the people currently using this station will still experience delays for the foreseeable future, with no fix in sight.

        Yes for high speed, but people using the current low speed system will have to continue using it once Alto is running.