There’s been a lot of talk about SMR’s over the years, it’s nice to see one finally being built.
Even if it comes in over budget, getting the first one done will be a great learning experience and could lead to figuring out how to do future ones cheaper.
Assuming it’s on time, completion in 2029, connected to grid in 2030.
A baseload supply shouldn’t need to throttle up and down, it’s the Base Load. The load that exists 24hrs a day.