There’s been a lot of talk about SMR’s over the years, it’s nice to see one finally being built.

Even if it comes in over budget, getting the first one done will be a great learning experience and could lead to figuring out how to do future ones cheaper.

Assuming it’s on time, completion in 2029, connected to grid in 2030.

  • Daryl@lemmy.ca
    link
    fedilink
    arrow-up
    1
    arrow-down
    1
    ·
    4 hours ago

    This technology was so highly classified that any mention of it by those developing it would lead to their lifetime incarceration, stated clearly in the non-disclosure agreements they had to sign They could not even mention the theory and general technology behind it. The background tech only came to the public attention when Russia and China started commercializing it, and this forced the Americans to acknowledge it. It was a Russian ice breaker that was the first commercial vessel to use nuclear power, and even at that it was wrapped in military secrecy. But America refused to allow any development on a Western equivalent for ‘military security’ reasons.

    https://interestingengineering.com/energy/commercial-nuclear-adoption-ship

    But the most effective way for America to completely prevent any development of this nuclear technology was to make it essentially impossible for any commercial outfit to get insurance on these propulsion systems, making it impossible for them to enter any port.