ValueSubtracted@startrek.website to Canada@lemmy.caEnglish · 21 hours agoOttawa proposes sweeping new land-seizure powers for Alto high speed rail projectwww.cbc.caexternal-linkmessage-square15linkfedilinkarrow-up137arrow-down10
arrow-up137arrow-down1external-linkOttawa proposes sweeping new land-seizure powers for Alto high speed rail projectwww.cbc.caValueSubtracted@startrek.website to Canada@lemmy.caEnglish · 21 hours agomessage-square15linkfedilink
minus-squarekent_eh@lemmy.calinkfedilinkEnglisharrow-up9·19 hours agoPlus the alignment of the existing tracks is not straight enough to allow for high speed rail. To do high speed you need the track as straight and level as possible, with any curves being very long and very gradual. The existing freight lines (and especially the older underused ones) don’t have any of those properties.
Plus the alignment of the existing tracks is not straight enough to allow for high speed rail.
To do high speed you need the track as straight and level as possible, with any curves being very long and very gradual.
The existing freight lines (and especially the older underused ones) don’t have any of those properties.